Work Procedures

From YouTestMe Wiki
Revision as of 06:27, 30 December 2014 by Admin (talk | contribs)
Jump to navigation Jump to search

Introduction

This page provides insight into the work procedures, non-related to the application, that you might find useful.

Source Control System – Subversive SVN

Policies

Never check in the code that does not compile!

Code in SVN has be complete – anybody should be able to check out entire project from SVN and be able to compile it without any fixing, adding libraries and similar.

Eclipse hidden files “.project” and “.classpath” have to be checked into SVN because the project cannot be opened in Eclipse without them. Any other file required to open and build the project from scratch has to be checked into SVN.

Update and Commit your code frequently to avoid code conflicts.

Use SVN to Rename, Move or Remove files.

Communicate your development plans to other team members.

Do not check in things in SVN that do not belong there (for example: third party software or manuals). We keep those in designated directory.

Never put the Java source code in production. Always deploy application as “jar”, “war” or “ear”.

Occasionally test your code by checking it out (or exporting it) to empty directory and try to compile it. If there are errors then code is not properly checked into SVN or it is not complete. You should fix it as soon as possible.

Bugzilla

Bugzilla will be used as an issue tracking system on YouTestMe project. All team members should regularly check items assigned to them and update them accordingly as per instructions provided below. Bugzilla also sends email reminders about tasks assigned to you. If you are receiving reminders about tasks that you completed you should change status of that task to “RESOLVED” or “CLOSED”.

Update items assigned to you by:

Reassigning it to other team member if you think that task is not for you:

Assigned.png


Adding a “deadline” – an estimate when you think the task will be completed. If the task is more complex you can add “Hours Left” so workload can be redistributed in case the item becomes critical.

Time.png


Closing items that are completed and putting the comment containing the solution:

Comment.png


Bugzilla Access

Go to http://bugzilla.mallocinc.com, insert your username and password and click “Search” on top left side, after that click “Advanced Search” on the right side. Then select a “Product” you are assigned to work on, select other options if necessary, and click “Search” at the bottom. Select the priority level and enter assignee’s name in order to search the tasks and then click on the task that has the highest priority (P1). Under this task, some useful features will appear such as:

-Hours spent on it;

-Hours remaining to finish it:

-Deadline;

-Add attachment;

-Comment (to communicate about the progress of the task)

Make sure to update these features regularly.

For more information, please visit The Bugzilla Guide

You can also go to Bugzilla for Humans to see a detailed presentation about it.